Steel cutting is going down now, most of the straight cuts have been made to the deck and crank connections. We've still got to cut the lightwall chords and the Overtruss which will get double, double checked before we get into it. Work is going on so stick around and see how the bridge gets made everybody. Phil and Jessica in the shop as well, so shadow them and see the money cuts on the mill.
Jessica's going to precision mill two flanges and get some webbing cut so we can make our first beam pieces this Saturday -- so long as we get the Tinius beam in 1203.

Matt will cut some more in 1203 after Fiber Polymer Reinforced Concrete class this afternoon. Say 5 p.m. to 9 p.m. - then go grab a burrito down at Guad.