The A Side is almost completely done. Now that Phil has taken care of business, he's been welding like a mad dog. The structure looks great. Things lined up way better than expected thanks to that survey equipment and to the two big beams. Tonight we'll get the A-Side pieramids in line, set up for the B Side which we'll fit and weld on Saturday. Phil also got some new Tungsten's today, so we're ready to fire. Need to talk to Tom Bell about fixing the mini-MIG, it's having feeding issues. Also need to line up another mini-survey station for use tonight.
The Rev, CQ, Rishi and Phil will finish up the LT doves which we'll need to get started on the A Side LT once everything has been fitted. We also need to finish building our portable revetments.
All the hard work is paying off everybody. Let's finnish strong, do it right, and not rush too fast to the load test.